eng
Sydney
09:27
Fast pyrolysis plant FPP 02 for disposal sewage sludge
Fast pyrolysis plant FPP 02 for disposal sewage sludge - photo 1 Fast pyrolysis plant FPP 02 for disposal sewage sludge - photo 2 Fast pyrolysis plant FPP 02 for disposal sewage sludge - photo 3 Fast pyrolysis plant FPP 02 for disposal sewage sludge - photo 4
Renewed: 13 November 2019, 17:49

Fast pyrolysis plant FPP 02 for disposal sewage sludge

Price on request
Vakhitov Albert
Vakhitov Albert
директор по развитию
Flagma member since 14 September 2016

Description

The problem of any city is the disposal of silt sludge from wastewater of water utilities!
Waste landfills are full (Sludge beds are overcrowded)
Biohazard (presence of parasites and heavy metals))
Fixed costs of removal, placement and negative impact on the environment
Lack of efficient and quick payback solutions for complete disposal

The FPP02 - fast pyrolysis plant is designed for thermochemical processing and disposal of sewage sludge from wastewater from water utilities to produce liquid biofuel and fine coal.
FPP02 can process other types of waste: wood waste, polymer waste (HDPE, LDPE, PE), Tetra Pak, bird droppings, manure, oil sludge, railway sleepers, straw, peat, brown coal.

Potential equipment customers: biological treatment facilities of urban water utilities, agricultural holdings, timber companies, agricultural enterprises, and chemical industry enterprises.

Productivity 4000 tons / year (12 tons of dry waste per day)
The yield of liquid pyrolysis products (bio-oil)
The output of solid pyrolysis products (coal)
Energy consumption - up to 50 kW
Operating Mode - Continuous
Overall dimensions, d * sh * v, 6 * 6 * 11 m
The need for external energy sources: raw materials, el. energy 50 kWh
Max. particle size of biomass, up to 50 mm
Execution: mobile (modular blocks in sea containers)
 

 Advantages of FPP02: mobility, autonomy, reliability, performance tuning depending on the type of waste;
 Possibility of 100% utilization of sludge from sewage sludge and production of bio-oil (raw materials for diesel fuel) and bio-coal (coal for reclamation of solid waste landfills) from it;
 Capital expenditures (CAPEX) are 3 times lower than existing technical solutions for the disposal of sludge;
 Operating costs (OPEX) are 2 times lower in relation to existing equipment analogues;
 Guaranteed economic profitability even with low productivity (our technology for the disposal of sludge, both from a technical point of view and from an economic point of view, is affordable and cost-effective for small settlements)
 The cost of equipment is several times lower than the existing world analogues and pays off within 2-3 years

The FPP 02 fast pyrolysis unit is a real cost-effective solution to the problem of utilizing sludge from sewage from any city!

Write to us. We will provide a description of the equipment and price offer.

Ad number: 486   |  views: 4  
Flagma member since 14 September 2016
Still looking for:
Contact the company
Vakhitov Albert
Vakhitov Albert
директор по развитию
By phone
In messenger
Say, that you found an ad on Flagma
Write a message
Select category
×
Login to your account